When you work with Morin Consulting we will support you throughout your modernization project so that you have the best possible service and peace of mind regarding the smooth running of your project. The 10 steps presented below will therefore give you a good idea of how a modernization project unfolds. For more details on the benefits of doing business with a consultant, you can refer to the article “Why work with a consultant”
Step 1: Project review
Collect basic data
Evaluate the main challenges of the project
Specify the location and conditions of the buildings
Step 2: Site visit (s)
Confirm existing conditions
Assess the current state of equipment
Evaluate the different modernization scenarios
Step 3: Analyze the data
Determine the scope of the work
Evaluate the costs of materials and labour
Identify related works: architectural, electrical and mechanical
Step 4: Preparation of tender documents
Write documents according to budgets
Define the technical specifications of the equipment
Establish restrictions and constraints
Step 5: Visit of the bidders on the site
Answer the questions
Ensure that everyone has a good understanding (nature and scope of the work)
Step 6: Evaluation of bids
Check compliance with the estimate
Validate the proposed schedule
Evaluate the capacities of the tenderers
Step 7: Approval of drawings
Affix the engineer's seal of approval on the drawings
Step 8: Participation in site meetings
Focus on the health and safety of workers and users
Ensure close monitoring of the progress of the work
Step 9: Preliminary inspection of the work
Evaluate the work performed according to the estimate
Identify the problems and corrective measures to be made
Step 10: Issuance of the certificate of completion
Perform the final inspection of the works
Issue a certified report guaranteeing that all work has been completed according to standards
Review warranty documents